Knowledge Base
v5.24.2
Search this version
Why are PDF documents being flagged as false positives by VirusBlokAda?
Issue:
PDF files, including official letters or documents with standard formatting, are sometimes flagged as suspicious by the VirusBlokAda engine
Cause:
The issue is often related to the Heuristic Scan feature, which can mistakenly classify normal PDF structures as threats. Resolution / Workaround:
Verify that the flagged PDF is from a trusted source.
If confirmed safe, adjust the VirusBlokAda settings:
Disable Heuristic Scan, or
Set Heuristic Scan Level to Level 1 to reduce unwanted detections.
Note: Disabling or lowering heuristic scanning may reduce detection sensitivity, so only adjust this setting if false positives are persistent.

Support:
If Further Assistance is required, please proceed to log a support case or chatting with our support engineer.
Last updated on
Was this page helpful?
Knowledge Base
Knowledge Base
Configuration and Settings
Errors and Troubleshooting
Features and Functionality
Feedback and Support
Licensing, Setup and Deployment
Testing MetaDefender Core
Updates, Patches and Bug Fixes
Version Upgrades